Monday, 23 March 2015

Script

EXT

filming going up into an attic then marbles rolling around crazed

the camera pans over a book mountain stash, with tissues placed on top like snow, and then see a climber climbing the mountain than it pans to the top on the mountain a lego man paragliding.
going to have light and gentle music playing

after that it pans to a police chase and the zombies chasing the police and people running away from the zombies.  The sound going to be playing are people screaming and sound or people running


then cuts to some teddy bears having a tea party, then dinosaur come running and trample on the teddy bear tea party and then soldiers come and start shooting them. going to have sound effects of something breaking and screaming.

lego builders getting destroyed by the dinosaurs as well going to have the same sound effects.

then it cuts to and you hear sound of cars racing and then you see toy cars racing.

Then every toys stop what they are going and walk to the end of the table and bowing down to their leader then it pans to see who they are doing that to.

Evaluation

I this project we had to make a stop motion animation in groups of four. When we got into groups of four we had to pick what type of stop motion animation we are going to do after that we share out what parts people are going to do in the group then when they finished to send it to everyone after so everyone has the work.

What I had to do is come up with a company name by doing a mind-map with different ideas for names after I picked what name we are going to use, I went and did a logo for the company so people will know what our company called. Before we could start the animation we had to do a storyboard so it would be easier to shoot the animation.

The software that I'm going to edit the animation on is premiere pro because you can edit it in detail and it can cut down the pictures more so then don't look like they have just took pictures that they are actually moving normally. As well as that we have to add some sounds and music in it so make it look like a little movie.

The parts that went well in the animation was doing the planning and picking what we are going to do and what things we need to do before we start to take the picture for the animation.

The parts that didn't go well was being in the group because no one was actually working on the project I was the only one working on it and then when it came to filming no one had the objects they got ask to bring in and they haven't done the plans so I had to wait for them so I said to everyone should make their own video instead of doing it as a group because the people that are up to date can do the video and the ones that aren't doing it can do it in their own time.


If we do this again I would make sure that the people I work with that actually will do the work and I won’t have to do all the work myself and have them sitting there taking the credit for the work I have done, as well as that make sure everyone knows what they are going to do and what they need to do.  

Thursday, 19 March 2015

Monday, 16 March 2015

Log

We had to get into group of four and then we had to pick what we are going to do for our animation, after we pick what we were going to do we share what work we needed to do and after we did that we send the work to each other and added it to our blog.

We are starting to plan what we are going to do for our animation. We started by doing  mood board on the equipment we needed and then made up a storyline making sure that we have put the things in that we have picked.


After we did that we came up with different names for our company name we plan it out as a mind map and then after we picked our name we name it into a logo as well.

We are planning what parts we need to film first and when we are going to film and who is bring in what.

We pick that we are going to film week next and we know who bring what in and as well who doing what when filming the animation. We was supposed to film last next but no one bring in toys and I was the only one that did so it was hard to film when only one person brought stuff in.

Hopefully we are going to film today because we need to start to edit the animation because we don't have long before we have to hand it in.

last week the two people in or group thought we were going to film but when we got in a ready but the other people weren't they didn't bring anything in and they were doing other work instead so that's when we thought about doing two different animation.

Our group have pick to do two different animation videos because two of us are waiting or the others so we can start to film but they are not doing anything so we pick to do two different one so then the two that what to finish can and the other one can do it in their time.

We are taking pictures at home and then in the lesson we put the picture together and make the animation.


No one was doing what we pick so I said I rather do the filming on my own and they do their own one to we have different videos.

When we pick doing the animation video on my own i went and told the teacher about it and she said that I can do it during the easter holidays, so then i can finish up the planning ready to start taking pictures.

We are started to edited the film for the animation because we was having trouble uploading the pictures to the computer so we had to wait until it let us edit we had to go on different editing softwares to find one that lets us edited our film.